The 10th run of the EuropeTrain started with the third French Loop via the Netherlands and Belgium.

After nearly three weeks of intense activity at the DB Systemtechnik test centre, EuropeTrain started again on Saturday 26 November 2011 at 09:45 from Minden to Bad Bentheim, crossed the Netherlands and reached Antwerp in the evening. From here the train was transferred to Paris Le Bourget on Sunday 27 November. During the French Loop several cycles are planned from the train’s temporary base in Paris Le Bourget to Lyon (9x), to Metz (2x) and to Marseille (1x). The return trip via Belgium and the Netherlands is planned for mid December.